Pinehurst Roadwork Updates

by
December 5th, 2017 No Comments

Pinehurst Roadwork Updates

Base repair roadwork is postponed due to the weather. All base repair and final blacktop coating is anticipated to resume in March (weather dependent).

Top coat:

The following roads are anticipated to receive a top coat in the Spring:

  • Hemlock Point (non-cda)
  • S. Glade Ct.
  • N. Glade Ct.
  • Glade Ct
  • Edgewood Ct
  • Lake Edge Ct
  • Edgewood Rd (from E. Lakeridge to  Lake Square Ct)
  • Lake Square Ct
  • Lakeview Ct
  • Rimrock Pl
  • Twin Lake Ct
  • Lake Front Ct
  • Longbeach Ct
  • Old Barn (non-cda section)

Base Repair: Edgewood Court and Lake Edge Court

1/2/18

Base repair roadwork is postponed due to the weather. Therefore, roadwork on Edgewood Court and Lake Edge Court did not begin today. All base repair is anticipated to resume in March (weather dependent).
Please note: The base repair is to correct structural issues on the road. A final blacktop coating is anticipated to occur in the spring.

12/28/17

Base repair on Edgewood Court and Lake Edge Court West begins Tuesday, January 2.
The roads will remain open with minimal interruptions. Residents are asked to refrain from parking on these roads while repairs are occurring.
Please note: The base repair is to correct structural issues on the road. A final blacktop coating is anticipated to occur in the spring.

 

Base Repair: Lake Square Court and High Beach Court West

12/21/17

Base repair on Lake Square Court and High Beach Court West are complete. The base repair was to correct structural issues on the road. A final blacktop coating is anticipated to occur in the spring.

12/20/17

Base repair on Lake Square Court and High Beach Court West begins tomorrow, Thursday, December 21. Repairs are anticipated to be completed by 5:30 pm tomorrow (12/21).
The roads will remain open with minimal interruptions. Residents are asked to refrain from parking on these roads while repairs are occurring.
Please note: The base repair is to correct structural issues on the road. A final blacktop coating is anticipated to occur in the spring.
Information will be shared once it is received regarding additional roadwork scheduling

Base Repair: Hemlock Point Road and South Glade Court

12/21/17

Base repair on Hemlock Point Road and South Glade court are complete. The base repair was to correct structural issues on the road. A final blacktop coating is anticipated to occur in the spring.

12/19/17

Base repair on Hemlock Point Road and South Glade Court continued today. Please use caution navigating Hemlock Point Road. The road was backfilled with millings. The road is open with a section coned off from roadwork equipment. All driveways remain accessible.

12/18/17

Base repair on Hemlock Point Road and South Glade Court began today, December 18. Please use caution navigating Hemlock Point Road. The road was backfilled with millings today. The road is open with a section coned off from roadwork equipment. All driveways remain accessible.

12/15/17

Base repair on Hemlock Point Road and South Glade Court begins the week of December 18. The roads will remain open during this period with minimal interruptions.
This image highlights the section of Hemlock Point Road and South Glade Court receiving base repairs starting 12/18. Residents are asked to refrain from parking on the road while repairs are occurring.

Base Repair: Old Barn Road and Ridgecrest Road

12/15/17

The base repair roadwork on Old Barn Road and Ridgecrest Road is now complete. A final blacktop coating is anticipated to occur in the spring. Thank you for your patience.

12/12/17

Due to the weather, base repair roadwork on Ridgecrest Road is beginning tomorrow instead of next week. Ridgecrest Road will be closed from 12 pm-3 pm on Wednesday, December 13 and Thursday, December 14. Below outlines the main road repair work.

We apologize for the short notice and thank you for your understanding.

12/13/17: The road contractor will be digging out the failed sections of the road and backfill with stone on Old Barn Road and Ridgecrest Road. Ridgecrest Road will be closed between 12-3 pm.

12/14/17: Asphalt base work will begin on Old Barn Road and Ridgecrest Road. Ridgecrest Road will be closed between 12-3 pm.

A final blacktop coating is anticipated to occur in the spring. Thank you for your patience.

12/6/17 PM

There is a stone trench on Old Barn Road. Please be careful and drive slow. Crews expect to have asphalt on the patch tomorrow. Thank you for your patience.

12/6/17 AM

Crews are continuing base repair work today on Old Barn Road. There will be minimal traffic interruptions.

12/5/17

Base repair on Old Barn Road and Ridgecrest Road began yesterday, December 4. Saw cuts starting at Old Barn Court to Ridgecrest Road will continue this week weather dependent. The roads will remain open during this period with minimal interruptions.

Please note: The base repair is to correct structural issues on the road. A final blacktop coating is anticipated to occur in the spring.

Updated information will be shared once it is received regarding additional roadwork scheduling. Updates to this roadwork porject will be available on this blog post.

Thank you for your patience.

11/29/17

Base repair on Old Barn Road and Ridgecrest Road begins the week of December 4. The roads will remain open during this period with minimal interruptions.

Information will be shared once it is received regarding additional roadwork scheduling. Thank you for your patience.