WestWinds ECC Guideline for:
Patio, Walkway, Retaining Wall Submittal
Adopted February
15, 2006 by WW ECC
Supersedes
all previous WW ECC Patio Etc. Submittal Guidelines
Reference
Article VI, Architectural Standards, Section 1 of the WestWinds Covenants: “The WestWinds Environmental Control
Committee (ECC) shall have exclusive jurisdiction over all construction
(including original construction and any and all modifications, alterations
and/or additions thereto) and landscaping on any portion of the Properties”
Procedure
for Submission:
An
application package is to be received by the ECC no later than the last Friday
of the month preceding the month in which the ECC meets (ECC meets the first Wednesday
of each month to review applications).
Request to
include:
1. WestWinds ECC Application Form (found in the
WW Community Directory or may be accessed via LLA website at www.lakelinganore.org. and clicking on
WestWinds/WW ECC Information and Application Form).
2. Site plan showing location, including
dimensions of the project and distances from existing structures and property
boundaries.
3. Drawing (or photograph) illustrating final
appearance of proposed project.
4. Material to be used such as flagstone,
brick, cement, pavers (provide color), etc.
5. For patios and walkways, a Landscape Plan is
required if landscaping is part of the project. For retaining walls, a Landscape Plan is
required. Provide on the Landscape Plan
the names of shrubbery/trees and final height/width growth of each
.
6. Application fee of $20 (make check payable
to WestWinds Village, Inc.)
Mail
complete application package with check to the WestWinds Environmental Control
Committee, P.O. Box 589, New Market, MD 2l774.